How to keep a running plan moving

Odalys BrennerHouse build
PromisedTue Apr 20
ForecastMon Apr 19
Framing took 6 hours longer→ +6 h — the buffer covers it

What a running plan is

A plan is running once you have pressed Start plan. From then on it holds two dates: the one your customer was promised, and the one the work is really headed for. Your job is to keep telling it what happened, so the second date stays true.

You do that in plain words. FieldStone reads them, moves the forecast, and only stops to ask a person when the finish would pass the promise. If you have not built a plan yet, start with how to plan a job.

Step by step

  1. 1

    Read the three figures at the top

    Open the Jobs page, press the ⋯ menu, choose Plans and pick the plan. Three figures sit at the top. Promised is the day your customer was told. Forecast is the day the work is headed for, with the hours of buffer left under it. Where it is shows how much is done and which stretch you are on. When the forecast is later than the promise, it turns bronze and says how many working days past it is.
    Odalys BrennerOn track
    PromisedTue Apr 20What Odalys was told
    ForecastMon Apr 199 h of buffer left
    Where it is42% doneStretch 2 of 5
  2. 2

    Log what happened

    Press Log updateand write it the way you’d text it. As you type, a box headed FieldStone reads shows what it took from your words and, on the line with the arrow, what that will change. Nothing is saved until you press Save update, so if it read you wrong, change the words first. Anyone who can open the plan can log. On a phone, the crew lead does the same thing with Log today — see the mobile app tutorial.
    Log update
    Log an updateWrite it the way you’d text it. FieldStone works out what it changes.
    Framing took 6 hours longer
    FieldStone reads
    +6 h on framing
    → +6 h — the buffer covers it
    CancelSave update
  3. 3

    Say what is finished

    This is how a plan moves forward. Say what is done, or how far along it is: Framing is done, Roofing is 60% done, Rough-in inspection passed. It goes on the work you name. If you name none, it goes on the work under way. If your words fit more than one piece of work, nothing is ticked off — name the work more exactly. Work that is only expected is not ticked off either: won’t be done until Friday does not mark anything finished.
    Framing is done
    Framing done
    → On pace
    Roofing is 60% done
    Roofing 60%
    → Ahead of the plan
    Siding won’t be done until Friday
    Note on the plan
    → No change to the forecast
  4. 4

    Say what pushes it later

    Four things move the forecast back. Extra hours: took 6 hours longer adds them to the work under way. A delivery, an inspection or a permit with a new day: say the day, as in Inspector moved us to Thursday morning. And rain: say the day, and the hours if you know them. Rain is checked against the outside work planned for that day. A small slip is absorbed — the line reads the buffer covers it, the forecast moves, and nobody is asked.
    Inspector moved us to Thursday morning
    Inspection → Thu Apr 15
    → Inspection moved — the buffer covers it
    Rain Wednesday 9 to 3
    Rain Wed Apr 14, 9 AM–3 PM
    → Checked against the outside work
  5. 5

    Decide when the finish passes the promise

    When an update pushes the finish past the promised day, a decision card appears above the tabs. It says what happened, lists the options, and for the one you pick shows what it does to the finish, what it costs and whether the customer has to be told. One option is marked Recommended. Approve change takes the option you picked. Leave schedule keeps the plan as it is and asks you why.
    One way back to the promiseFraming ran 17 hours over. The finish moves from Tue Apr 20 to Thu Apr 22.
    Add a Saturday on framingRecommendedFraming crew, 8.5 h overtime
    Move the finish to Thu Apr 22 and tell OdalysThe plan stays as it is
    FinishBack to Tue Apr 20
    Cost+8.5 h overtime
    Tell OdalysNot needed
    Odalys was promised Tue Apr 20. Without a change, the finish is Thu Apr 22.
    You can approve this.
    Leave scheduleApprove change
  6. 6

    Know who decides

    Your business sets who may approve each kind of change. Unless you change it: a small shift inside the same day is made by FieldStone on its own; moving work between days needs the project manager; changing a date the customer was given needs the project manager; spending money needs the owner. Someone higher up can always approve what someone below them can. If a change is not yours to approve, the button reads Send to and the name of the person it goes to. The business owner sets all of this on the Jobs page: ⋯, then Plans, then Who decides.
    Who decides
    Small shift, same daye.g. Paint starts 30 minutes later
    FieldStone, on its own
    Move work between dayse.g. Swap Wednesday and Thursday work
    Project manager
    Change a customer datee.g. Finish moves from Fri to Mon
    Project manager
    Spend moneye.g. A Saturday overtime day
    Owner
  7. 7

    Tell the customer

    Approving a new finish date does not text anyone. It only writes the text. It sits in a card headed Telland your customer’s first name, where you can change the words, and it goes only when someone presses Send text. The tab named What, the customer’s first name, then hearsshows the approved date, the forecast — marked internal, and never quoted as a promise — and how a question like “When are you starting?” — or, once work has begun, “Are you still coming tomorrow?” — would be answered today. A decision still waiting changes nothing they hear.
    Tell Odalys
    Hi Odalys — a quick update on your house build. Some of the work took longer than planned, so we now expect to finish Thursday, April 22, 2 working days later than planned. — Corwin, Hale & Finch Builders
    Goes from your business line, into the job’s thread.Send text
    What Odalys hears
    ApprovedFinish Thu Apr 22
    ForecastThu Apr 22Internal — never quoted as a promise
    PendingNothing
    If Odalys calls or textsAre you still coming tomorrow?Yes — tomorrow’s on, and you’re on track to finish Thu Apr 22.
  8. 8

    Change the plan by hand

    On the Plan tab, drag a bar to move it, or drag its right edge to stretch it. Click a bar to change who is on it, the hours of work or the people on it, then press Apply. Put it backundoes a move. On a running plan this is the plan owner’s to do — if the plan is someone else’s, a bar you drag becomes a request they put in. Finishing one stretch early does not pull the next crew in early: a later stretch never starts before the day it was committed to.
    Framing
    Roofing
    Siding
    Roofing
    WhoRoofing crew
    Hours of work34
    People on it3
    Put it backApply
    Drag a bar to move it, its right edge to stretch it, or click it.
  9. 9

    Look back at what came in and what was decided

    Updates lists everything logged on the plan, newest first, each with what was read from it and what was made of it. History lists each decision: what happened, what FieldStone suggested, who chose what, and how it played out. The plan sits on its job, so the conversation and the invoices are one click away — see the Jobs tutorial.
    Updates · 3
    Update · Corwin HaleToday 7:52 AM
    Framing took 17 hours longer
    +17 h on framing
    → +17 h — the finish passes the promise, now Thu Apr 22
    History
    Apr 13 · 2:14 PMOne way back to the promise.FieldStone suggested: Add a Saturday on framing.Corwin Hale: Approved: Add a Saturday on framingWaiting to see how it plays out.

Say what happened, in your own words, and the plan keeps itself honest — you only step in when a date your customer was given is about to move.

Something not working? Report a problem