How to send a proposal and get it signed

ProposalSent
Framing$96,300
Roofing$31,200
Interior finishes$141,500
Waiting on a signature

What this is

A proposal is the page your customer reads and signs. You do not type it up. FieldStone builds it from the budget you already made, so the two can never disagree.

The customer sees one price for each part of the job and one total. They never see your labor, your materials or your markup. This page shows you how to shape the proposal, send it, answer a change request and get it signed.

Step by step

  1. 1

    Open the Proposal tab

    Open an estimate in Estimates and press the Proposal tab. The page is already written. It is built from your budget: one line and one price for each division. Each price already has your overhead, contingency and markup inside it, so the customer only ever sees the finished number.
    Prepared forOdalys Brennan27 Larkspur Lane
    Contract amount$401,900
    Scope and price
    Site work and foundation$58,400
    Framing$96,300
    Roofing$31,200
    Plumbing and electrical$74,500
    Interior finishes$141,500
    Total$401,900
  2. 2

    Shape the page

    The column on the right changes how the page reads. Turn on Scope under each division to print what each part covers. Round to tidies the prices: Exact, $100, $500 or $1k. It always rounds up, so the customer is never quoted less than your budget. Starts within sets how many weeks after signing the work begins. Under Terms, tick the ones you want on the page, or press the plus to add a term for this job only.
    Page
    Scope under each division
    Round toExact$100$500$1k
    Starts within3weeks
    Terms
    Payment schedule
    Changes
    Not included
    Driveway poured lastthis job
  3. 3

    Look for a price below cost

    You can press any price on the page and type a different one. If a division ends up priced lower than it is expected to cost you, FieldStone writes Below cost beside it, and lists it again above the send button. Fix it, or leave it if you mean it. Every price you changed is listed under Differs from budget, and the small arrow there puts it back.
    Framing$96,300
    RoofingBelow cost$27,000
    Interior finishes$141,500
    Differs from budget
    Roofing$31,200$27,000
  4. 4

    Download the PDF, then send it

    Press Download PDF to read the proposal the way your customer will. When it looks right, press Send to and their first name. FieldStone asks first. It tells you the amount, that it goes by email, or by text when there is no email on file, and that the budget locks until you revise. Press the send button and a short message tells you which way it went.
    Rev 1Draft
    Send to OdalysBy email, or a text when there’s no email
    Send Rev 1 to Odalys Brennan?They get $401,900 by email, or by text when there’s no email on file. The budget locks until you revise.
    CancelSend $401,900
    Sent Rev 1 to Odalys by email
  5. 5

    What your customer sees

    They open a link on their phone. No account, no password. The page shows the scope, the price and the terms. Under it are three choices. They can type their name, sign with a finger if they like, and press Accept this estimate. They can press Ask for a change and write what they want different. Or they can press No thanks. Back on your side, the proposal shows when it was sent and whether they opened it.
    Total$401,900
    Your nameOdalys BrennanSignature (optional)
    Accept this estimate
    Ask for a changeNo thanks
  6. 6

    Answer a change request

    What they wrote comes back onto the Proposal tab in a blue box. Press Revise. FieldStone asks first, because the link they have stops working until you send the new one. Say yes and Rev 2 starts as a draft. Rev 1 is kept exactly as it was sent. The budget unlocks, so you can change the numbers. If you need a new price from a subcontractor, see sub bids. Then send Rev 2 the same way.
    Rev 1Sent
    Odalys asked“Can we swap the shingles for a metal roof?”
    Sent 2 days ago · openedRevise
    Start Rev 2?Rev 1’s link stops working for Odalys until you send Rev 2. Rev 1 is kept as it was sent.
    CancelStart Rev 2
  7. 7

    When they sign

    Won gets a green tick on the stage line at the top, and the proposal is marked Signed with the name they typed. That page is now frozen as they signed it. A green line appears: “Signed. Make it a job to start the work.” Press Make it a job. The signed proposal goes onto the job and everyone on the estimate is assigned to it. Next, read how to plan the job.
    Request
    Budget
    Proposal
    Won
    Sub bids
    Signed. Make it a job to start the work.Make it a job
    Signed by Odalys Brennan. This page is frozen as they signed it.
  8. 8

    If it goes nowhere

    Press the three dots at the top of the estimate, then Mark lost. Pick a reason or type your own, so you remember why later. The estimate now says Lost, with the reason beside it. Changed their mind? Press Reopen and it comes straight back.
    Mark Odalys Brennan lost?
    Went with another bidPrice too highNot doing it this yearNo answer
    CancelMark lost
    Lost · Price too highReopen

Build the budget once, and the proposal, the revision and the signature all come from it.