How to send work out for bids and pick a sub
Plumbing2 of 3 in · due in 4 days
Pinecrest Mechanical$8,700
Rivera Plumbing$8,900
Blue Heron Plumbing
Budget$9,000
What this is
Some of the work on a job is not yours to do. You hand the plumbing to a plumber and the wiring to an electrician. Sub bids is where you ask a few of them for a price, on the same estimate you already built.
Every sub gets the same scope. Their prices come back into one table, next to your own budget. You pick one, and the reason you picked them is saved with it.
Step by step
- 1
Mark what goes out to bid
Open an estimate in Estimates and go to the Budget tab. Open the division you want a sub to price. In the box called “Bid out as”, type the trade: Plumbing, Electrical, Roofing. Leave it empty for work you do in-house. Once it is filled in, that division shows up on the Sub bids tab. The budget has its own budget tutorial.Rough plumbingBid out · PlumbingPriced byDanaBid out asPlumbing - 2
See every scope in one list
The Sub bids tab has one row for each trade you marked. A row shows your budget, how many bids are in, the lowest one, and how it sits against your budget. The status tells you where it stands: Not sent, Out for bids, Pick one when the bids are ready to compare, and Selected. Press a row to open it.ScopeBudgetLowestStatusElectrical$6,200—Not sentPlumbing2 of 3 in$9,000$8,700Out for bidsRoofingSummit Ridge Roofing$14,000$13,600Selected - 3
Send it out for bids
Open a scope and press Send out for bids. Tick the subs you want. Each one shows how ready their paperwork is, which comes from the Subcontractors app. Someone not on the list? Type their name and an email or a phone number, then press Add. Your own business number is turned away, because there is nobody there to invite. Fewer than 3 bidders is flagged. Choose when bids are due, in 3, 5, 7 or 10 days, and tick Labor / materials if you want the price split in two. The right side shows exactly what the subs get: the scope, never your budget or your notes.Who’s bidding2 bidders · fewer than 3Rivera Plumbing100% readyBlue Heron Plumbing60% readyPinecrest Mechanicalbids@pinecrest.exampleSub’s nameEmail or phoneAddBids due · In 5 daysLabor / materialsWhat they getNot your budget or notesSend to 2 - 4
What the sub gets
A sub with a phone number gets a text. A sub with only an email gets an email with a button. Either way the link opens with no account. On that page they read the scope and type one price for the whole job, split into labor and materials if you asked for it. They can list what is not included, attach their own proposal, or pass and say why. Reminders go out on their own before bids are due, by text or by email, the same way the invitation went.Has a phoneHi Marco! Oakline Builders is inviting you to bid on Plumbing.Email onlyInvitation to bid: PlumbingSee the scope and bidYou’re invited to bidYour price for the whole scope$8,400Labor$5,100Materials$3,300Not includedPermitCan’t bid this oneSend my bid - 5
Compare the bids on equal terms
Back on the scope, every bidder is lined up under a row called Your budget. Bid is the price they sent. Leveled is that price plus anything they left out. The last column shows how far over or under your budget they are. When more than one bid is in, the lowest leveled one is tagged Lowest. Press a bid to open it. Under Left out, put a cost beside each thing they skipped, or press the plus to add one they did not mention. Now a cheap bid with holes in it and a full bid are read the same way.BidderBidLeveledvs budgetYour budget$9,000Pinecrest MechanicalLowest$8,700$8,700−$300Rivera Plumbing$8,400$8,900−$100Left outPermit+ $500 - 6
Pick one
Press Select beside the bid you want. Tap a ready-made reason or write your own. If your pick is not the lowest bid, a reason is required, so anyone looking later can see why. Picking waits until the job is won: the Select button shows up once the customer has accepted the estimate.Select Pinecrest MechanicalPlumbing · $8,700Lowest complete bidBest scheduleWorked with them beforeMost complete scopeWhy them?The other bidder is marked not selected.CancelSelect - 7
After the pick
The sub you picked gets a congratulations message, by text or by email. The other bidders are marked Not selected, and their link tells them you went another way. Your reason stays on the scope with your name beside it. From here the Cost plan uses the picked price in place of your budget number for that trade. Picked the wrong one? Change undoes it, as long as the estimate has not become a job yet.Pinecrest Mechanical · $8,700“Lowest complete bid” — DanaChangeCongratulations, Priya! Oakline Builders picked your bid for Plumbing. We'll be in touch with the next steps.Rivera PlumbingNot selected - 8
Invite more bidders
Once a scope is out, the button changes to Invite more. Use it when a sub passes or too few prices come in. The new bidders get the same scope and the same due date as everyone else.PlumbingRough plumbing · budget $9,000 · Due in 4 daysInvite moreBlue Heron PlumbingDeclined
Same scope to every sub, every price on one line, and the reason for your pick written down.